Actually I think I have a change of plan so work with me through this:
The server hosting the Backup Exec software (I don't care about backing it up) has 1 CPU with 2 Cores (nothing virtual).
The Hyper-V server, I am upgrading so it will have 2 CPU's with 4 cores each.
VJware, you were saying I needed 1 core BE license. Do you mean 1 CPU or 1 per core?
I think the rest of what you say would not change because even though I am adding 1 CPU to the Hyper-V server, it is covered by the 1 Agent license.
Correct?