Hello,

We noticed this morning during the synchronisation run of all the  Ev servers, that one  CAS( Exchange 2010) server was up to 100 % for few minutes.We looked and realized that all the tasks are running via the same CAS server.

Is there a way to configure a task to use a specific CAS ? We could then distribute the load

Installing a supplementary CAS server is NO option as we are migrating to exchange 2016.

Right now EV 11.0.0 CH5 is installed.

Thank you for your help.

Sandrine

  • Hello Sandrine,

    I'm not sure that is possible, but will try to find something. To 'fix', how about you change the tasks schedule to sync? You could then define each task to sync at a specific time, to lower the burden on the CAS server.

    Instead of running them all at 12/24, schedule tasks per server 1/13, 2/14 etc.

    You need to use MSMQ to see when the sync finishes:

    The Synchronization process will be managed by the Enterprise Vault Exchange Task for <ExchangeServerName>  A7 Queue (for Enterprise Vault 8.0 and later). Once the A7 Queue has returned to 0 items, the Synchronization process has completed.  

    If and when I find additional info, I'll let you know.

5 Replies

  • Hello Sandrine,

    I'm not sure that is possible, but will try to find something. To 'fix', how about you change the tasks schedule to sync? You could then define each task to sync at a specific time, to lower the burden on the CAS server.

    Instead of running them all at 12/24, schedule tasks per server 1/13, 2/14 etc.

    You need to use MSMQ to see when the sync finishes:

    The Synchronization process will be managed by the Enterprise Vault Exchange Task for <ExchangeServerName>  A7 Queue (for Enterprise Vault 8.0 and later). Once the A7 Queue has returned to 0 items, the Synchronization process has completed.  

    If and when I find additional info, I'll let you know.

    • sandrine_goetha's avatar
      sandrine_goetha
      Level 6

      Thank you Gertjan,

      This is exactly what I proposed my boss but he doesn't want that we run it during working hours as it is load on an already overloaded CAS ( this is the case for all of them).

      The final agreement we had was to only run it during the night when nobody else ( more or less) is using the CAS machines ( people not working), as there are no change in between the night shift and the morning runs ( it was rather redundant and we can live with the 1 day delay if there is a problem).

      If you find something about a fix I would anyway be happy to hear a bout it .

      Regards, Sandrine

      • GertjanA's avatar
        GertjanA
        Moderator

        Hello Sandrine,

        The only thing I can find is that it is possible to define to use a specific Global Catalog server, but it does not seem to be possible to define which CAS server to use (or balance that).