OST media must be overwritten when backup jobs start?
what is the schedule of DLM (Data Lifecycle Management) for expire image? The expire image is deleted immediately when the backup set expire ? or wait for specfic schedule?
Refer to attachment in previous post, the schedule of DLM is different from the schedule of deduplication storage (12:20 AM and 12:20 PM).
During this DLM, the disk space from deduplication will free up disk space immediately?
For example, one backup job was started at backup at 9:00PM on 1 Jan and completed at 10:00 PM on 1 Jan . The retention period is 1 day. The backup set should be expired at 2 Jan 10 PM. Do it means that DLM would be ran on 2 Jan 10 PM? Then I can the entry in audit log from Backup Exec 2012 in the same time.