Lbellefeuille
8 years agoLevel 4
Robot Control Host
Hello everyone, I would like to know if shutting down for a short period a robot control host (like an hour) would have an impact on current running backup job ?
Thanks
Providing no tapes need to be loaded or unloaded in that time you will be fine.
If you are running backups that do not finish, or require another tape - they would continue to run.
Drives will be unaffected (each media server sees the drives directly), only robot operations will fail (moving tapes).
As advised, it's pobably best to do this when jobs are not running.