If I understand this right, having a backup job called e.g. "Job 1" and a job called e.g. "Job 2", both are incremental jobs, using the same selection list, are both running every 2nd day.
The only different is that “Job 1” starts e.g. 1 December and “Job 2” starts e.g. 2 December.
Then will "job 2" not take backup of the files that are changed since "Job 2" ran last time, it will only backup those files that have changed since the last incremental backup?