cancel
Showing results for 
Search instead for 
Did you mean: 

BE 9.1, Netware 6.5.7, 2009 Holiday schedule

p-rod
Level 3

I am trying to enter the holidays for 2009 into my current jobs list. After entering the holidays they are not being displayed all of a sudden. Not sure what i am doing wrong.

 

pedrod

2 REPLIES 2

Graham477
Level 2
Same problem here but with BE 9.2 on NW 6.5 sp6

I go into the Calendar in the Installation/Maint section and double click on a date. Then clicking OK to save the date as a holiday should update the calendar so that the date appears in green as a blocked out holiday. But it isn't saving it. No error message either.

I also updated HOLIDAYS.DAT manually as described here:

http://seer.entsupport.symantec.com/docs/247763.htm

but it still doesn't show the holidays on the admin screen.

Graham477
Level 2
Using the option to manually update the HOLIDAYS.DAT file I removed old holidays for 2007 and 2008. Replacing the file in SYS:\\BKUPEXEC with the smaller edited file seems to have worked.

So it could be that there is a file size limit on HOLIDAYS.DAT?