12-18-2013 10:25 AM
Dear Team,
My symantec backup exec job rated was slown down to 20 MB/min where as it was 780 MB/min it take 40 to 80 hours unbeliviable
i have having exchange server 2010 in DAG envirnoment with 5 databases.
how can i finetune job rate please help....
god blessings
Solved! Go to Solution.
12-22-2013 12:12 AM
12-18-2013 09:28 PM
12-18-2013 09:41 PM
Hi,
What have you tried to do in terms of troubleshooting? Have you...
1. Restarted the media server?
2. Made sure there are no hardware issues on the Exchange server (failed/failing drives)?
3. Tried to copy data between the media server and Exchange server (both ways) to rule out possible network issues?
4. Are any other remote servers (if you have any) experiencing the same issue, or is it only the Exchange server?
Why can't you update to BE 2010 R3 (NOT R2!)? The ISO is on the link below along with the latest SP:
http://trialware.norton.com/files/fc/Backup_Exec_2010_13.0.5204_MultiPlatforms_Multilingual_DVD.iso
http://www.symantec.com/docs/TECH208601
If you stop any AV running on the media server along with the BE services (grab copies of the Data/Catalogs folders BEFORE doing the upgrade), you should be able to run the upgrade.
So you'd:
1. Upgrade to BE 2010 R3;
2. Upgrade to BE 2020 R3 SP3;
3. Run LiveUpdate to update with any additional patches;
4. Push-install these updates to your remote servers...
Then try the backup again.
Thanks!
12-19-2013 02:22 AM
12-19-2013 02:41 AM
Hi,
You mean 1000MB FULL right? Not 100MB?
Thanks!
12-19-2013 03:43 AM
Hello Rabbani,
hOW TO UPGRADE IS THERE ANY SPECIAL METHOD OR SIMPLY RUN LIVE
--> Please refer to the following technote for upgrading to BE 2010 R3.
http://www.symantec.com/docs/TECH159557 : How to: Direct upgrade path from Backup Exec 11d/12.0/12.5/2010/2010 R2 for Windows Servers to Backup Exec 2010 R3
Thanks,
-Sush...
12-22-2013 12:12 AM