I see what you're getting at, but is there no way to limit the number of jobs that I have? Basically, if I was using tape, and I do a weekly full and a daily differential, then I have two jobs becase the tape simply gets cahgned out. But with disk, I need to create a job for each day of the week when a differential runs for the first week, a weekly full job, and then I need to repeat those steps for weeks two and three. Any way to avoid this?