Hi all,
for BE 11d rev 7170 w/SP3
whenever I try to edit a scheduled backup in the calendar for a single day, lets say I want to put one day on Hold Schedule, the problem is that all the days change to Hold Schedule when the change is made.
Could it be a hotfix patch that is needed?
thanks.
Ken