cancel
Showing results for 
Search instead for 
Did you mean: 

Per resource pre/post scripts

ricdanger
Level 4
Hi,

I'm trying to setup a grandfather-father-son backup job that will backup resources that need different pre/post scripts. The same tape sets are to be used.
As far as I can see, there is no way to set the scripts per resource or resource type, and each policy can only apply to a file set.
How should I setup this job so that each resource has it's own script, but the GFS rules still apply?

Thanks.


1 REPLY 1

Ken_Putnam
Level 6

You could create several jobs linked by a policy, one for each resource.

Make the first job Overwrite and all the rest Append, all pointed to the same media set

This way, each job can have it's own pre/post routines