It's configured as a single job where there are multiple selections: Exchange and then other files on the same server. It is a single backup job that overwrites. The backup job is large enough that once a week I do a full backup, and then the rest of the week it's a differential. Also, the backup job is big enough to require two tapes, but not three, which it is currently doing since it loads a new tape after backing up the information store.