Is is possible to run 2 jobs to the same machine at the same time, ie one to tape one to btd, from different sources?Message was edited by: Aaron Cassity
What I was planning to run a brick level backup of exchange to hard drives while a file server is backing up to tape, once the exchange backup is done I was going to schedule a job that would send the file to tape. Would there be a problem with the ...