We have a backup solution that occasionally spills over on to 2 tapes. We have an 8 slot auto loader with 1 tape for each day and we want to have a 'spare' tape in slot 8 in case it is needed.
I am configuring media sets now and this doesn't look too difficult (previously our jobs have been configured so that the tape in slot 1 runs on Monday, slot 2 on Tuesday, etc). However, we would like to be alerted if the tape from slot 8 is used, so it can be stored and replaced. I can't see an alert category that fits the bill here. Or is there some other method of doing this? We don't really want to have to manually scrutinise each day's logs to see if we need to change that tape!
Any ideas?