cancel
Showing results for 
Search instead for 
Did you mean: 

BE optimize dedup replication

pgm10s
Level 5
Partner Accredited Certified

Hello

     I try to research about Backupexec  optimize dedup replication feature,

Can we schedule the image replication at the specific time or schedule?

Can we limit (throttle) the bandwidth that use to replicate the image?

 

Thank you.

1 ACCEPTED SOLUTION

Accepted Solutions

pkh
Moderator
Moderator
   VIP    Certified

Yes.  It is just the normal duplicate job, just like the one that you use to duplicate from disk to tape.

View solution in original post

3 REPLIES 3

pkh
Moderator
Moderator
   VIP    Certified

If you are talking about the optimised duplication feature that duplicates backups between two dedup folders, then yes to both your questions.

When you duplicate from one dedup folder to another folder, it is just a normal duplicate job or duplicate stage, so you can schedule the duplication.

You can throttle the bandwidth.  See this document

Enabling bandwidth throttling for Optimized Deduplication duplicate jobs in Backup Exec 2010 R3

pgm10s
Level 5
Partner Accredited Certified

Thank you very much. In case of the replication betwwen 2 media server , can we schedule the replication job?  It use the normal duplicate jobs to perform replication

pkh
Moderator
Moderator
   VIP    Certified

Yes.  It is just the normal duplicate job, just like the one that you use to duplicate from disk to tape.