I have set up a backup job that backs up several drives (C, D, Exchange etc) however I have noticed in the job log that it backs up C drive then goes through and verifies D, Exchange, Shadow Copy Components, etc then goes through and backs up those drives AFTER the verify process. It is causing errors during the backup - Cannot Verify C (which makes sense seeing as it hasn't backed C drive up yet). Anybody have any ideas why it would do this and how I can fix it?