Hello
we have 4 scheduled backup-jobs. 2 starts at 11.00pm. the 2 others are scheduled for 11.20pm.
the 2nd starts after the 2 first are terminated. in this case about 5.00am.
by the last daylights savings time change the 2 first starts correctly. the two 2nd jobs dont start, even no message or alert was indicated.
is the reason the time-change or what?
thank you for an answer.
Rolf