Using BEWS11d for my backups, I am having difficulty with the use of pre-commands prior to job start. In the pre-command setup, I am using the same syntax I use at command line; of course, command line works fine. In order to avoid complication (or so I thought) I have avoided the use of 0/1 to denote success/failure of the command prior to the job. At this point the pre-command is set to time out within 5 minutes. From the command-line the task works in less than a minute to verify 30 computers are receptive to further instruction.
Anyone have any suggestions?
Regards,
Kelly Schmidt
Systems Administrator
Radio Design Group, Inc.