cancel
Showing results for 
Search instead for 
Did you mean: 

End/Fail job after running too long.

jst3751
Level 3
Partner

Is it possible to configure a backup job to end/fail if it runs too long?

 

Example, an incremental backup job starts at 1 PM and normally takes 5 minutes, but for some reason something hangs. The desired effect is if it runs for 20 minutes, to stop/fail the job and send a notification.

0 REPLIES 0