12-09-2008 01:48 PM
Is it possible to configure a backup job to end/fail if it runs too long?
Example, an incremental backup job starts at 1 PM and normally takes 5 minutes, but for some reason something hangs. The desired effect is if it runs for 20 minutes, to stop/fail the job and send a notification.