cancel
Showing results for 
Search instead for 
Did you mean: 

Force BEWS12 to fill tapes

JayW
Level 4
I have a policy with 10 jobs to run every weekend.  This weekend every job used a separate tape. 

How can BEWS12 be force to fill a tape before switching to the next tape.
1 REPLY 1

Ken_Putnam
Level 6
Each job must point to the same media set, and the 2nd through 10th job must all be defined as "Append" not "Overwrite"