10-20-2014 10:52 PM
Hello
We have configured backup set duplication in the following way:
but duplication job runs several times a day without relation to the backup job it have to duplicate, showing warning messages and ending with errors:
\
What is the right way to configure duplication?
10-20-2014 11:14 PM
Have a look @ these 2 KBs -
http://www.symantec.com/business/support/index?page=content&id=TECH87580
http://www.symantec.com/business/support/index?page=content&id=TECH87512
10-20-2014 11:19 PM
10-21-2014 08:01 AM
VJware, articles says that to duplicate my backups i need all the backups that took place between some period.
1) If the backup to be duplicated, took place "n" times, the duplicate backup selection list will contain "n" entries indicating the "n" occurrences of the backup whose backup sets are to be duplicated.
2) When a duplicate backup has successfully duplicated all the related backup sets, the duplicate backup selection list is cleared.
This is a policy misconfiguration, if the monthly duplicate backups were meant to duplicate "only" the full backup of the last week in a month.
As per the above policy definition, the monthly duplicate backup will duplicate all the full backupsets created between week1 and week4. Hence it is required that all the full backupsets are available when the monthly duplicate backup runs.
To say by the truth i dont get it. I have weekly and monthly full backups and duplicate jobs "binded" to them and all i need is to duplicate my last weekly/monthly backup. Why do i need some other backus to complete the duplication?
Thanks
10-22-2014 06:23 AM
So i decided to refuse from duplication and create seperate job for duplication