I currently have 2 servers that is backed up with a 2 drive autoloader (Dell Powervault 132T). I'm configuring 2 backup jobs for the 2 different servers. I've also configured drive 1 to backup server 1, and so on. The problem is, i need to allocate 2 groups of tapes for the individual backup jobs. How do i ensure that the backup job will use the tapes of their own group ? The 2 backup jobs need to be run concurrently. Any help would be most appreciated. Thanks a lot in advance.