I noticed that all the job notifications that are sent out automatically from Veritas is time stamping the email an hour earlier than the actual time on the server. The email doesn't generate until the job finishes and our email server indicates the correct received date/time, yet when you open the email, it indicates the time to be an hour earlier than actual. The server has the right time and it's been rebooted since daylight savings time change. I assume this problem started after the time change for daylight savings but I can't figure out where the time stamp is coming from, because it's not reading the server time stamp. I also noticed after daylight savings that several scheduled job start times were modified to start an hour later that originally scheduled and I had to go back and fix all of those. Is there a known problem with daylight savings and how do we fix this?