cancel
Showing results for 
Search instead for 
Did you mean: 

increasing waiting time for duplication

Daniel_Be_
Level 4
Partner Accredited

Hello,

is there any possibility to increasing the waiting time for duplications? The Problem is, that a lot of Backup Jobs start at the same time. The duplicate should start after the backup has finished. But sometimes the library is reserved by another duplications. So the duplicate Job has to wait more than 24 hours and get into the status missed. Is there any possibility to increase this timeout?

Thank you very much in advance,

Daniel

1 ACCEPTED SOLUTION

Accepted Solutions

Colin_Weaver
Moderator
Moderator
Employee Accredited Certified

You can schedule the duplicates instead if having them start immediately after the initial backup jobs finish. Edit the duplicate stage in the same way you would edit the backup stage and you should be able to find the scheduling choices.

View solution in original post

1 REPLY 1

Colin_Weaver
Moderator
Moderator
Employee Accredited Certified

You can schedule the duplicates instead if having them start immediately after the initial backup jobs finish. Edit the duplicate stage in the same way you would edit the backup stage and you should be able to find the scheduling choices.