12-03-2012 05:15 AM
I have 2 policies win23 and win46 and each have 5 clients.
Scenario:
Both policies run at 02:00 AM and both have same priority
NBU 7.1.0.2
LINUX OS
Solved! Go to Solution.
12-03-2012 05:48 AM
It all depends on available resources and if Multiplexing is enabled or not.
If both policies are due at exactly the same time, they will both be submitted. The amount of jobs that go active depends on available resources.
Have you read the article about Frequency based scheduling that I referred you to in your other post?
Please also read through How NetBackup determines which schedule to run next in NBU Admin Guide I as well as About multiplexing all the way through to Example of using multiplexing with schedules.
You can use 'nbpemreq -predict_all -date <mm/dd/yyyy HH:MM:SS>' to check/verify.
This looks like another WHAT IF scenario.
You are the best person to determine what the effect of schedules have on your environment.
We are happy to assist with real issues.
PS:
I believe you are aware of all of these posts?
https://www-secure.symantec.com/connect/forums/frequency
https://www-secure.symantec.com/connect/forums/himy-backup-window-set-0600-am
https://www-secure.symantec.com/connect/forums/query-8
https://www-secure.symantec.com/connect/forums/schedule-confusion
12-03-2012 05:48 AM
It all depends on available resources and if Multiplexing is enabled or not.
If both policies are due at exactly the same time, they will both be submitted. The amount of jobs that go active depends on available resources.
Have you read the article about Frequency based scheduling that I referred you to in your other post?
Please also read through How NetBackup determines which schedule to run next in NBU Admin Guide I as well as About multiplexing all the way through to Example of using multiplexing with schedules.
You can use 'nbpemreq -predict_all -date <mm/dd/yyyy HH:MM:SS>' to check/verify.
This looks like another WHAT IF scenario.
You are the best person to determine what the effect of schedules have on your environment.
We are happy to assist with real issues.
PS:
I believe you are aware of all of these posts?
https://www-secure.symantec.com/connect/forums/frequency
https://www-secure.symantec.com/connect/forums/himy-backup-window-set-0600-am
https://www-secure.symantec.com/connect/forums/query-8
https://www-secure.symantec.com/connect/forums/schedule-confusion
12-03-2012 07:10 AM
Multiplexing is not enabled
Backup is going on disk.
12-03-2012 07:46 AM
Whichever one hits the queue and requests the resources first. Simples.
12-03-2012 09:08 AM
It does not depends on the Schedule name,retention level,client not run for many days...etc ..etc
12-03-2012 09:12 AM
No it's which ever one hits the callback queue first and gets the resources assigned.
There may be some other underlying logic underneath the hood. Why do you need to know this?
12-03-2012 09:18 AM
ramLUKE,
please gothough the Marianne suggestions, and posts listed above, they will help you to understand it..
12-03-2012 09:19 AM
Because i need to configure backup for my environment.Please tell me that logic or rule .
12-03-2012 09:30 AM
It depends on resources such as drives and how your policies are configured. Go and read Mariannes post as already suggested. IF you don't have the available resources then some jobs will queue if you don't use multiplexing with your policies configured correctly and don't have enough drives etc some jobs may queue.
12-03-2012 09:39 AM
If it is in a single policy,then NBU will neglet the other schedule which coincides?
12-03-2012 09:40 AM
Let me guess: Data Domain???
Please show us Storage Unit Settings:
bpstulist -L
12-03-2012 09:49 AM
You need to give us details of your config:
bppllist <policy-name> -U
bpstulist -L
Output of nbpemreq as per my post above.
PS: Have you read the sections in the manual as per my post above?
Have a look at the example in the manual - it applies to disk as well when you have Maximum concurrent jobs enabled in STU and MPX in policy schedules.
Also show us job details of a queued job.
We have messed around enough with theory.
Please show us something to work with.
12-03-2012 10:11 AM
This doesn't compute. You were talking about 2 separate policies before. Now you are talking about schedules? Schedules in 1 policy or shedules in multiple policies. Nothing will be 'ignored' if you have the resources multiple policies can run, if you don't then 1 will queue, the 1 that is last in the queue.
12-03-2012 04:07 PM
Cheers,
12-03-2012 08:12 PM
12-03-2012 09:43 PM
Concurrent Jobs: 1
Not good!
No wonder you have status 196's!
But none of the schedules in your policy seem to use this STU?
The policy also does not reflect the config in your opening post.
It does not help to show us bits and pieces of unrelated output...