cancel
Showing results for 
Search instead for 
Did you mean: 

How long will BE set the job as missed if it did not start according to schedule in BE2010

SymQNA
Level 5

How long will BE set the  job as missed if it did not start according to schedule in BE2010 ?

How long BE2010 will retry the missed job? Can customize the time in BE2010?

1 ACCEPTED SOLUTION

Accepted Solutions

pkh
Moderator
Moderator
   VIP    Certified

It depends on how the parameter "...  keep the job scheduled ..." below is set (see below).  During the period, the job will be retried.  After the period, it will be deemed as missed.

BE 2012 - cancel job within 1 hour.png

View solution in original post

2 REPLIES 2

pkh
Moderator
Moderator
   VIP    Certified

It depends on how the parameter "...  keep the job scheduled ..." below is set (see below).  During the period, the job will be retried.  After the period, it will be deemed as missed.

BE 2012 - cancel job within 1 hour.png

RahulG
Level 6
Employee

refer the technote https://support.symantec.com/en_US/article.TECH44658.html

This should answer both your queries