cancel
Showing results for 
Search instead for 
Did you mean: 

Pre/Post cancel command increase/remove

Zymos
Level 2
Is there any chance in getting either a disable script 'cancel command if not completed' or increase the time to more than the 500min limit you got atm.
The limit is very disturbing when using VCB for backing up servers and the time backing up is longer than 500min causing jobs to fail. Please do some kind of change for this. I'd rather disable the function totally on a VCB-job than having it cancelled because it takes more than 500min when having large amounts of data.
 
/Zymos
1 REPLY 1

awreneau
Level 4

I agree!

 

I'm having the same problem.  I have to break the VCB script into two jobs in order for it to work.  We should have the option to extend the time or disable the option alltogether.

 

 

Has anyone found a 'hack' for this?