Scenario:
Powervault 124t.
I have a number of daily "full" backup jobs, and each has it's own media set (which will contain only 1 tape).
All tapes right now have been erased and sitting in "scratch media."
"Tuesday Full" is set to run tonight - will it just grab the first available tape in the "scratch media" list, write data to it and when finished, move that tape to the "Tuesday" media set and basically begin the OPP (set to 6 days).
If so, basically when each job is set to run that night, I'll need to make sure that the tape I want assigned to that backup job and media set is first in line in the "scratch media?"
Thanks.