Hi,

I have about 20 policies, one for each server. It's translate to about 115 jobs. In each policy I can use rules to be sure that duplicate jobs to tape start only after duplicate job to disk finish. I want to do the same kind of rules for the jobs to be sure that only one duplicate job to the SAN run and I want to be able to chain each jobs to a specific order ...

Any idea how it can be done ? or if another product can do that ?

Thanks
2 REPLIES 2

Ken_Putnam
Level 6
I don't think you can do it with policies (I've never tried something that complex)
 
To chain jobs, you could always do it the old fachioned way.  Set up a BEMCMD job to run each of the chained job, then call the next as a POST job
 
That is: have StartJob2 as a POST job of Job 1,  StartJob3 as a POST job in job 2 etc

mlimtl2
Level 2
I'll take a look  at that monday , seems promissing

Thanks