cancel
Showing results for 
Search instead for 
Did you mean: 

inc backup seem to do a full backup

mghomer
Level 6

Hi all,

 

I'm just confused about some jobs within my BE2010. I have two Jobs one is full and one is inc. Every weekend the BE do the full backup and every day only a inc. So but it seems that the inc backup every day the whole data. If i take a look in in the jobs i see the same data day by day are backuped.

The Job is setuped to incremetal and to use and reset the archivebit.

Im macking up a qnap storage its a linux system and i have installled a agent for qnap on this device

 

Hope somebody here can help me.

 

1 ACCEPTED SOLUTION

Accepted Solutions

VJware
Level 6
Employee Accredited Certified

For Linux based, use modified time & not archive bit...If you cannot install RALUS on this system, then ir-regardless of what backup method you use, it would always be full...

for diff & incr to work, RAWS or RALUS needs to be installed

View solution in original post

2 REPLIES 2

VJware
Level 6
Employee Accredited Certified

For Linux based, use modified time & not archive bit...If you cannot install RALUS on this system, then ir-regardless of what backup method you use, it would always be full...

for diff & incr to work, RAWS or RALUS needs to be installed

mghomer
Level 6

thank you!