Hello,
Currently we are running BE v10 on 2 sepparate servers, with 2 HP LTO', backing up diffirent data/servers
I am looking to install BE 11 to our systems, but i'm looking to simplify things.
Is it possible to install 1 copy on 1 server and run 2 jobs the same time, with 1 tapedrive located in another server ?
Would this cause any performance problems ?
So it would be something like this
server 1 - HP LTO 1
server 2 - HP LTO 2
Server 2 has installed V11 and has 2 backup jobs, starting at 11pm
-job 1, with LTO1, backing up data from 4 servers
-job 2, with LTO2, backing up server 2 who hosts the exchange 2003
Thanks in advance