cancel
Showing results for 
Search instead for 
Did you mean: 

scheduled backup job times gone crazy

Alan_Jones
Level 2
I have read a few of the threads concerning problems with backup jobs after the time change. I seem to have that and more. I can watch Job Monitor and my scheduled times change before my eyes! I have gone back to each job and set up the time window and dates to run like I want .. go back to Job Monitor and watch the start time changing an hour at a time. A job scheduled for the current day changes to the same day a week ahead. Try to right click a job and do a "Run Now", the systems thinks about it, says "To be scheduled" and then goes back to what it wants. Tonight I just created a new "Full" job and it seems to be running ok but my Differential jobs seem hopeless. Do I delete my jobs and start over?
1 REPLY 1

shweta_rege
Level 6
Hello,


-- How did you schedule the jobs?


-- Are the jobs policy based jobs?



Perform the following steps and verify the results.


1. Run Beutility from \Program files\Veritas\Backup Exec\NT

2. Add the Backup Exec server to All Media Servers ( File >> New >> New Media Server )

3. Right click on the Backup Exec server listed in "All Media Servers" and select "Repair Database"

4. Check the results after repairing the database



Thank You,

Shweta