cancel
Showing results for 
Search instead for 
Did you mean: 
Jess_Lee
Level 4
since ‎03-25-2006
‎07-19-2016

User Statistics

  • 40 Posts
  • 0 Solutions
  • 0 Kudos given
  • 2 Kudos received

User Activity

Hi all, I had done import on 2 medias. We need to re-use this media for other backup job. So I expired the image inside these 2 medias and attempt to change to a new volume pool. However, it failed and the media status - Imported. How could I change ...
Hi all, We have a tape library with 3 tape drives. 1 of the tape drive is in active state for few days, however no tape are assigned. With this situation, only 2 tape drive can be use for backup jobs. Tired to reset, down the tape drive, but the erro...
Hi all, We configured disk staging in our environment. Every midnight, data backup on disk will be transfer to tape. We have around 10 duplication jobs running for disk to tape backup, however we only have a tape drive. 9 duplication jobs ended with ...
Hi,I had enable the schedule backup attempts to re-run the failed backup jobs over a specified time period.Is there a setting to specific the period to run on each individual job? eg. job A to re-run after 2 hours, job B to re-run after 5 hours, job ...
Hi,We configured a few ip in our backup master server. Our direction is to reduce the backup load on the network. We plan to saparate our backup client to different ip which connect to different switches.How to direct backup clients to go through the...
About
Kudos from