02-18-2009 08:46 PM
Hi we have Remote Offices, Head Office and a DR Site and installing BEWS 12.5 and using CPS.
Sites are linked by WAN with HO and DR having high speed links.
The idea was to install CPS at the DR site to protect the business server at the RO sites.
As there is no Backup Tape at the DR site I need to get the data back to the Head Office to archive to tape for off site storage.
Can I configure another CPS server at HO to protect the CPS server from DR site and then Archive to tape with BEWS?
02-26-2009 05:06 PM