cancel
Showing results for 
Search instead for 
Did you mean: 

Duplicate Jobs appened on same tape

Kent_Patel
Not applicable
We have REO(overland), ADIC tape library, and Veritas BE 10.0 .
Currently we have disk backup running, than we like to run disk to tape backup as duplicate jobs. Is there a way to append multiple duplicate jobs appened to a existing tape. We have about 6-7 jobs, when disk-tape job runs, after first duplicate jo the , second job write to another tape. In this senario we waste many tapes. We like to appened duplicate jobs to same tape, when that tape is full move to next.
Is this possible ???

Thanks,
-Kent
2 REPLIES 2

Asma_Tamboli
Level 6
Hi Kent,

You could set the Append and overwrite periods according to your needs.

Probably the following documents could help you:

http://seer.support.veritas.com/docs/237374.htm



http://seer.support.veritas.com/docs/192265.htm




Note : If we do not receive your reply within two business days, this post would be marked ‘assumed answered’ and would be moved to ‘answered questions’ pool.

Jon_Langmead
Level 2
Hi Kent

Was it as simple as setting the overwrite and append parameters..... only we've just introduced duplication and I'm seeing exactly the same thing....

kind regards
Jon