04-19-2010 08:44 AM
Our current resources (both hardware and monetary) hamper the ability to perform a full Grandfather - Father - Son backup Rotation. We are currently utilizing a hybrid Father/Son backup as follows:
5 Weekly Full Backups (done friday night)
2 Weeks of Daily Incremental (Mon - Thu) backup to disk w/ copy to tape.
My Full backup is done straight to tape (Compressed LTO 3)
I have established a policy to perform this task selecting from two media sets (Full and Incremental).
I have encountered two issues that I need guidance correcting.
1. During the incremental, the backup to disk rotates only two files instead of 8. How to I configure the backup to cycle between 8 files over two weeks?
2. I need to write protect the tapes until the next time they are needed. So incrementals should be write protected for 13 days while fulls are write protected for 27 days.
So far, utilizing "media management options", I've only figured out that "None" allows me to perform a backup. "Partial" will not allow me to write to the tapes.
04-19-2010 12:53 PM
04-19-2010 01:07 PM
I walked myself through setting this up with that giant admin guide. So I think I changed the defaults on that.
Attached is my B2D Device settings. I have all of 1.8 TB for incrementals. My daily reports show between 50 and 75 gb being backed up daily and over 980GB in my full backup.
I thought the "Maximum Number of Backup Sets per Backup to Disk File" was the option to tell it to make 8 backups and then start recycling. But as you can see, it has only generated two and rotates between them every other weekday.
I need it to create a seperate file for each of the 8 daily incrementals and after two weeks, start using the oldest file.
04-19-2010 09:03 PM