I would like to find a way to stop the job on a schedule. Ideally it could be done by a batch file or something run by task scheduler as I haven't seen anything in BE12 to do it. I'd like for it to basically stop at 7PM on weekdays and not at all on weekends. Also, is it possible to restart the job without running it(ie doing a full backup) Is any of this possible? Thanks in adavance.
Doug