05-03-2012 08:44 AM
I have full backup jobs that are setup and have run. The problem comes in when I want to setup the incremental jobs. The only option I see is to setup the incremental at the time I setup the full backup, which I do not want to do because I want the incrementals to run on a different schedule than the full. Can this be done? Or am I jsut missing where this can be done?
Thanks,
Jay
Solved! Go to Solution.
05-03-2012 11:41 AM
aaah, i haven't used the wizard in a while :)
try setting up a job without the wizard
05-03-2012 09:18 AM
Yes, you can have the incrementals running at a different schedule...What is the version of BE ? And are you trying a stand-alone job or policy based jobs ?
05-03-2012 11:20 AM
I have BE 2010 R3. I am running stand alone jobs. Do you have to setup the incremental at the same time you setup the full? Or since I have the fulls already built, can an incremental be setup seperate (or added onto the full)?
05-03-2012 11:30 AM
You can create an incremental job, scheduled as you wish, and call the same selection list
05-03-2012 11:32 AM
since this is BE 2010 & not BE 2012, it would be a separate job for the incr
05-03-2012 11:39 AM
Here is the list of jobs I can setup. Unless I am starting a job incorrectly.
05-03-2012 11:41 AM
aaah, i haven't used the wizard in a while :)
try setting up a job without the wizard
05-03-2012 12:01 PM
Aaaah, yes not using the wizard lets me do what I want. Thank you for pointing me in the right direction!