cancel
Showing results for 
Search instead for 
Did you mean: 

Disable all Jobs while patching

arctics2
Level 5

We're about to upgrade our 5230 appliances to 2.6.0.3 and I want to be sure our scheduled jobs don't start during the patch.  What's the easiest way?  All jobs are configured through SLP's.

 

Thanks
 

1 ACCEPTED SOLUTION

Accepted Solutions

arctics2
Level 5

FYI, per support:

 

To suspend backup jobs in policies: nbpemreq -suspend_scheduling
To resume Backup Jobs in policies: nbpemreq -resume_scheduling

For any duplication Jobs run:
nbstlutil inactive –lifecycle <lifecycle name>
nbstlutil active –lifecycle <lifecycle name>

 

 

 

View solution in original post

1 REPLY 1

arctics2
Level 5

FYI, per support:

 

To suspend backup jobs in policies: nbpemreq -suspend_scheduling
To resume Backup Jobs in policies: nbpemreq -resume_scheduling

For any duplication Jobs run:
nbstlutil inactive –lifecycle <lifecycle name>
nbstlutil active –lifecycle <lifecycle name>