HI,
I have netbackup where my server stages all the backups to my san and the during the day it sends the backups over to tape.
Currently it leaves the images on the server that have been moved to tape for two weeks but i want it so that it goes to the disk stu then during the day it goes to tape and has a retension of 2 weeks on tape, but it deletes the off the disk stu`s
How is this possible.