07-25-2017 03:47 AM
Hi All,
We are configuring the backup to tape using RMAN. We are testing the backups,but are facing the issue.
We could able to run Increment backup successful,whereas Full backup is failing with error code 6 and code 29.I have checked the script and everthing is fine.Database is linked.
Kinldy help us in resolving the issue.
07-25-2017 05:10 AM - edited 07-25-2017 05:11 AM
More info please...
As in NBU versions on server and client, OS on server and client, Oracle version, timeout settings (connect and read) on master and/or media server, all text in Details tab of failed job, rman output file, bphdb and dbclient log on client...
Is the same script used for Full and Incr jobs?
07-25-2017 05:52 AM
Hi @Vinutha,
In addition what @Marianne said, can you check these TNS?
https://www.veritas.com/support/en_US/article.TECH18717
https://www.veritas.com/support/en_US/article.000034089
Regards,
Thiago