04-15-2015 09:09 AM
I've done some digging with google and the 7.5 admin guide, and I can't find an answer to my question. I have my schedules all setup the way I want and they run correctly. I have a weekly schedule setup to run the 1st, 3rd, 4th, and last Saturday. The monthly is set to the 2nd Saturday.
I have a situation where I need to run a extra copy of the monthly backup. If I go in and add a specific date of 4/18 for the monthly, will the Specific day run or the recurring saturday for the weekly, or both?? I know I can work around it and make it do what I want, but it sure would be nice if I could just go in and add a specific day to run something special when needed. Thanks.
04-15-2015 10:50 AM
if I am not wrong, if your weekly and monthly schedule start time is same , then it will look for the longer retenction schedule and give prority to that one and only run the longer retenction schedule.
04-15-2015 11:01 AM
i jsut did the small test with calender schedule and yes it did trigger the only schedule whith the longer retenction.. when both scheduels have the same start time.
04-15-2015 11:17 AM
Why run another backup? Just duplicate the monthly (bpduplate/SLP/Vault)
If 2 jobs are scheduled at the same time, the one with the higher retention will run. If either starts before the other than assuming it uses the full window, the other wont run.
04-15-2015 12:20 PM
They need to run it again it's a long story. I wish I could just duplicate it.
Since I don't have time to test this now and I will be out of town all weekend, unable to monitor this, here is what I'm going to do.
1) Weekly_Full, added an exclude date for 4/18/2015
2) Monthly_Full, added a specific date for 4/18/2015
Overall this is not too bad to manage. I was originally thinking I needed to uncheck the 3rd weekend, then remember to add it back in again next week. I'll do some testing of some small backups next week and see what it does with various configurations.