Since I've started keeping detailed logs of our media sets I've noticed that every few weeks tapes are being moved from one media set to another. I need these tapes to stay in their own media sets so they are not overwritten ahead of schedule. I do have some overwrite protection period parameters set on each media set, however this shouldn't cause a job to pull media from a different media set.
How do I prevent this from happening in the future?