Feature request for System Recovery Manager

Lasse_Thomsen
Level 4
One of the nice features of System recovery Manager is that you can asign backup jobs to groups of computers.
 
Another great feature is the ability to auto schedule the jobs over a period of time 0-1440 minutes (schedule 6 computers over 60 minutes and each computer starts 10 minutes apart) this help to stop all the servers to flood the network at the same time.
 
I would like a feature added to the above that also spread the baseline copy (full backup) over the chosen interval for the base line copies.
 
As an example: My setup is a full backup on sunday and inc. mon-fri. It would be better if the baseline could be auto scheduled over the full week. so server 1 does its full backup Monday, server 2 does its full backup Tuesday etc. Again this would help to spread the load on network and storage location.
 
 
1 REPLY 1

Bill_Felt
Level 6
Employee Accredited Certified
Hello,
 
That's a very good suggestion.  I will make sure this is added to our enhancement request list for BESR Manager and is considered for future releases.
 
Thanks.