02-21-2011 10:36 PM
Hello,
since a while when we setup a new server ii get in the backup proces continue this error:
V-79-57344-65072 the connection to the target system has been lost. Backup set canceled
When i search the error here, i only get other results wich are no solution for me.
in the eventlog is see this:
- | System |
|
|
|
|
|
|
|
|
|
|
- | EventData |
Backup Exec Alert: Job Failed (Server: "xxxx(Job: "xxxx -- The job failed with the following error: A communications failure has occurred. |
when we try to ping from the backup server everything is okWhen we try to ping from the new server enverything is ok
We have rebooted the server and the new server but no result
We also have set the priority a bit lower, but also with no result.
does anybody have a solution?
Solved! Go to Solution.
05-02-2011 12:00 AM
to bad, i replaced the scsi adapter in the server but the fault still exists
05-02-2011 01:26 AM
...and the small B2D job you ran?
05-02-2011 01:44 AM
the small job was hanging also,.
im trying now a job with only files, and no server
the job about 60 gb started with a rate of 2083 mb/s but its only 1495 mb/s, and it is now in verify state
it also looks, when the file goes over the 50gb the speed decreases with about 500 mb.s
ill keep you posted about this jobs!
05-02-2011 02:12 AM
the job completed succesfully.
pff thats strange.
i think there is no other way to split up al the jobs to check if possibly the problem is in a server or other files?
05-02-2011 02:43 AM
...that's where your job log comes in. You can turn on more extensive logging through Tools --> Options --> Job Logs, but that increases the size of your log, so bear that in mind.
You COULD also have a corruption in your selection list.
Create a new selection list with the same selections, and run a job before posting the results...
05-02-2011 08:57 AM
...also, what are the sizes of your B2D files?
05-04-2011 01:20 AM
I have rewrite al our backup jobs, and the problem is gonna.
it was a lot of wokrk but oke.
i have now still 2 problems left:
1. we dont ge an notification email (works before fine) test mail works good. (no spam etc problem)
2. a few duplicate jobs to tape stays on queued. the tape is not in user with another job!
size of our b2d is max 50gb
05-04-2011 01:28 AM
...I've had that happen before. Luckily I only run 2 jobs per site I look after, so it isn't an issue for me to recreate them.
1. Recreate the notifications - delete the recipients and the mail server information, and then try again.
2. Right-click the job and check the alert...you're going to have to respond to it. Make sure that you have enough connections enabled to the B2D so that multiple jobs can run at the same time...
05-04-2011 02:32 AM
1. ive recreated the email notice. ik hope it works tomorrow again!
2. the job is running now. Also hopes that it tomorrow goes some bit faster.
il post my comment tomorrow
thanks for your help so far
05-05-2011 01:19 AM
SUper
the email notice is also working again and all my hjobs are running properly
Thanks for your help guys
05-05-2011 01:48 AM
Hi,
You would generally mark the post that helped you find the solution, unless you found that out yourself
Thanks!